Installation: Wire partitions are designed that they may be erected by inexperienced labor. Shop Drawings are sent with all jobs so that your erector will understand how parts are assembled. Field bracing of partitions may be required, depending on the individual project and customer preferences. Bracing materials will be furnished only when the type and quantity are specified and requested. (Bracing is usually provided by the erector). All bolts and nuts that are required for assembly are provided. However, bolts, screws, floor and wall anchors required for attachment to building structure are not included, unless specified and requested.
Ordering: When ordering it is best to send a rough sketch, so that we may fabricate with the correct locations of doors and or sliding gates. Indicate the hinge side, swing direction and key side of all doors and sliding gates. Be sure to state the height and type of floor and wall conditions to which the partition are anchored. If there are pipes, ducts, beams, or other structural obstructions around which the partition must fit, please dimension these locations and their elevations (AFF – above finished floor).
Click here to request a quote.
|